
Support & Top quality controlWe source comprehensive drawings and offer whenever needed. Good quality and credit rating are the bases that make a company alive. Owing to our vast item assortment and rich encounters in this industry,
S series Helical Geared EPT Attributes
1. Attributes:
- Higher efficiency: 75%-eighty%
- High EPT: the helical EPT and a worm EPT combined with an built-in EPT to improve the torque and performance.
- Higher precision: the EPT is manufactured of higher-good quality alloy metal forging, carbonitriding and hardening therapy, grinding procedure to guarantee higher precision and steady managing.
- Higher interchangeability: highly modular, serial design, powerful versaEPTty and interchangeability.
two. EPT parameters
| Ratio | 6.8-288 |
| Input EPT | .twelve-22KW |
| Output torque | 11-4530N.m |
| Output velocity | five-206rpm |
| Mounting kind | Foot mounted, foot mounted with solid shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined hole, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. |
| Enter Approach | Flange input(AM), shaft input(Advertisement), inline AC motor enter, or AQA servo motor |
| Brake Launch | HF-manual launch(lock in the brake release placement), HR-handbook launch(autom-atic braking position) |
| Thermistor | TF(Thermistor security PTC thermisto) TH(Thermistor defense Bimetal swotch) |
| Mounting Situation | M1, M2, M3, M4, M5, M6 |
| Variety | S37-S97 |
| Output shaft dis. | 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, |
| EPT materials | EPT200 high-power cast iron from R37,47,57,67,77,87 |
| EPT substance | EPT250 Substantial strength cast iron from R97 107,137,147, 157,167,187 |
| Warmth treatment EPT | carbonitriding and hardening treatment |
| One Stage Effectiveness | 75%-eighty% |
| Lubricant | VG220 |
| Defense Course | IP55, F class |
About Us
ZheJiang EPT Drive Co.,Ltd,the predecessor was a condition-owned armed forces mould EPTrprise, was estabEPTd in 1965. EPT EPTizes in the total EPT EPT remedy for substantial-conclude products producing EPT based mostly on the intention of quotPlatform Solution, Software Style and Skilled Provider quot.
EPT have a strong technical power with above 350 personnel at present, incXiHu (West Lake) Dis.Hu (West Lake) Dis. in excess of 30 engineering specialists, thirty good quality inspectors, masking an location of 80000 square meters and kinds of EPT processing EPTs and screening equipments. We have a excellent basis for the sector software deveXiHu (West Lake) Dis.Hu (West Lake) Dis.ment and provider of large-end speed EPTs amp variators owning to the provincial engineering EPT study cEPTr,the lab of EPT pace EPTs, and the foundation of contemporary R ampD.
Our Team
EPT Control
EPT:Insist on EPTrovement,Attempt for Excellence With the deveXiHu (West Lake) Dis.Hu (West Lake) Dis.ment of equipment manufacturing indurstry,consumer never ever satirsfy with the existing high quality of our products,on the contrary,wEPT the value of top quality.
EPT policy:to increase the general stage in the area of EPT EPT
EPT Check out:Continuous EPTrovement , pursuit of excellence
EPT Philosophy:EPT EPTs value
3. Incoming EPT Manage
To build the AQL satisfactory level of incoming material control, to offer the substance for the EPT inspection, sampling, immunity. On the acceptance of certified goods to warehousing, substXiHu (West Lake) Dis.Hu (West Lake) Dis.rd merchandise to just take return, examine, rework, rework inspection dependable for monitoring bad, to keep track of the supplier to consider corrective
measures to avoid recurrence.
four. Process EPT Manage
The production internet site of the 1st assessment, inspection and last inspection, sampling according to the demands of some projects, judging the high quality modify craze
located abnormal phenomenon of manufacturing, and supervise the production department to boost, get rid of the irregular phenomenon or state.
5. FQC(Ultimate QC)
Soon after the production section will total the merchandise, stand in the customer’s place on the finished merchandise good quality verification, in purchase to make sure the high quality of
customer expectations and wants.
6. OQC(Outgoing QC)
Soon after the merchandise sample inspection to deterEPT the experienced, enabling storage, but when the completed solution from the warehouse ahead of the formal supply of the goods, there is a check out, this is named the shipment inspection.Examine articles:In the warehouse storage and transfer status to verify, whilst confirming the shipping and delivery of the
merchandise is a solution inspection to deterEPT the experienced products.
7. Certification.
EPT
Supply

